Mining
The Feasibility Study focuses on developing the Serrote deposit as an open pit mine that will supply sulphide ore to a flotation concentrator. The mine plan will be based on delivering approximately 7 million tonnes per annum of ore to the crusher. Copper concentrate with gold credits will be produced